Source EV Landowner Pack 11.25

Landowner Pack

EV Hub Requirements • 3,000 Ultra Rapid EV Charging Points throughout the UK and Ireland by 2028 • Located near primary Arterial Routes, built up areas, major transport hubs,retail parks, leisure, industrial, drive-thrus, destination locations and local amenities • Looking for leasehold opportunities preferably

• Ideally unrestricted 24/7 access • Minimum of 4 EV Charging bays plus substation • Target fleet/logistic operators and the general public • Traffic count — 15,000+ past/within vicinity per day • Ability to install canopies* • Drive-Thru Bays/LGV Bays* • Space for ancillary services (Vending machines, Tyre pressure gauges, car wash facilities)*

with a minimum 25-year term • Developed/undeveloped land

• Standalone sites or part of wider development • Suitable Grid Capacity — Identified at Source’s cost

*Additional criteria, but not essential.

Location targets Industrial and logistics

Hotel and leisure

Retail parks

Stadiums

Roadside locations

Drive thrus

Ports

Airports

Car parks

Urban/city

Powered by